Analysis Market access

ANSM overhauls radiotherapy quality control rules, with a third annex after 18 months

A decision signed on 25 November 2026 replaces the 2023 text for external radiotherapy and radiosurgery. Two annexes apply at once; the third follows later. Market access teams should check the cost and access implications.

VigiEye editorial · Fri 27 Nov 2026

What happened

On 25 November 2026, France's medicines and health products agency ANSM signed a decision setting the rules for quality control of external radiotherapy and radiosurgery installations. It replaces the 2023 text. ANSM's notice says two of the decision's annexes apply immediately, while a third follows after 18 months.

That is the extent of what the records confirm. The notice summary does not say what each annex covers, which equipment or sites fall under which annex, what changes in testing content or frequency, or when the 18-month period starts. Teams should read the decision text before drawing conclusions. This article does not try to fill those gaps.

Subscribe to keep reading

$4.99 / month

  • Every article, analysis and opinion piece on VigiEye and CompePharma
  • One subscription for both sites, cancel any time
Continue with Google
or
You'll be signed in straight away; we also email you a link to confirm your address. Reading every article takes a $4.99/month subscription (secure checkout by Stripe), billed monthly until you cancel; access starts at once, so the 14-day withdrawal right ends when it does. See our terms and privacy policy.

Sources this analysis is based on

Written by VigiEye's editorial system with AI assistance (model claude-sonnet-5-5) strictly from the official records listed above. It can contain errors: check the sources before acting. Not legal, medical or investment advice.

More analysis & opinionAll →